
(1) Fasten the bowl liner on welding positioner.

(2) Adjust the weight balance and dimension of ware area.

(3) Install the drive system.

(4) Start the welding procedure .Rebuild the jaw with APO (1.6mm ) welding wire and Hardface with HCO (1.6mm) welding wire.

(5) Welding job was done and check the dimensions.

(6) Rebuild and hardfackin job was done.